Steel 80m Telecom Shelter Self Supporting Tower

  • Model NO.: LS-T06
  • Conductor Circuit: Multi Circuit
  • Materials: Steel
  • Style: Cable Tower
  • Name: Steel 80m Telecom Shelter Self Supporting Tower
  • Avaivable Height: 5-100m
  • Wind Pressure: 5-180 Km/H
  • Installation on Site: Yes
  • Payment Way: 30% Down Payment
  • Trademark: LU STAR
  • Specification: Telecom tower
  • HS Code: 73082000
  • Usage: Flying Angle Tower, Crossing Tower, Tension Tower, Angle Tower, Terminal Tower, Transposition Tower, Branching Tower
  • Certification: ISO
  • Standard: Standard
  • Structure: Y Type
  • Material: Q345b/A572
  • Galvanized: Hot DIP Galvanization
  • Antenna Support Quantity: 3-18 PCS
  • Worker Training: Yes
  • Lifespan: 25 Years
  • Transport Package: by Sea or Land
  • Origin: China

Steel 80m Telecom Shelter Self Supporting Tower

Specification:

Avaivable Height:   5-100M
Wind Pressure:  5-180 KM/H
Material:  Q345B/A572,minimum yield strength >=345N/mm2;
Q235B/A36,minimum yiled strenght>=235N/mm2;
Galvanized:  Hot Dip Galvanization
Delivery Lead Time:    25 Days after receiving 30% Deposit
Lifetime:  Minimum 25 years
Working & Resting Platform Quantity:    1-3 PCS
Working & Resting Platform Quantity:    3-18 PCS
Antenna Support Quantity :    3-18 PCS


Performance Standard :
Besides conforms to the drawing and design, the materials and fabrication of tower components shall conform to the following standards (Chinese Standards) and customer's requirements. 
Steel pipe/angle/hybrid tower welding requirements 
1).we used CO2 welding and submerged arc auto welding or other methods. 
2).Welded seam shall be full penetration and grinded. 
3).The welded product has no fissure, scar, overlap, layer or other defects. 
Steel tower Galvanization/color painting
All steel items ,bolts ,nuts ,washers & other components to be hot -dip galvanized with uniform. As per (ASTM-A-123).paiting for corrosion proof

Welded requirements:
We used CO2 welding and submerged arc auto welding or other methods
Welded seam shall be full penetration and grinded
The welded product has no fissure, scar, overlap, layer or other defects
Galvanization:
All components are hot-dip galvanized with uniform

Steel 80m Telecom Shelter Self Supporting Tower

Related Production:

Power Transmission Line Tower
Communication Tower
Substation Steel Structure
Flare Tower
LSAW Steel Pipe

Steel 80m Telecom Shelter Self Supporting Tower
Our Project

>>.Ethiopian 400kv substation
>>.Macao University of Science&Technolofy Stadium
>>.The China Petroleum University Gymnasium
>>.Wuhan Qiantai Theater
>>.The Stadium Of Zibo City
>>.Huizhou Stadium

Steel 80m Telecom Shelter Self Supporting Tower

Quality Test:
Before put into production, all the material must pass the chemical and physical analysis to make sure that they have met the requested strength and component. we have more than 15 inspection procedures from incoming raw material to finished products

Before shipment, we have a final inspector manager to check the products on every detail and component to make sure it all meet the drawing.

Company Advantage:
1. The company has advanced digital physical and chemical laboratory.   
2. We have one 3000 tons CNC bending machine, have two domestic advanced digital automatic production line for steel pipe tower, have 6 automatic numerical control robot welding system, havetwo Steel tube joint welding machine , have 4 CNC plasma flame cutting machine, have 6 High
speed CNC Angle steel line and steel plate production line, one CNC tower foot welding robot system. ,2 CNC Plane drilling machine,1 sand shot blasting machine, 1 gantry type submerged arc
welding machine.6 cutting/shearing machine  
3. Annual production capacity of 200, 00 tons of hot galvanizing line and one Automatic  centrifugal bolt galvanizing line. 
Steel 80m Telecom Shelter Self Supporting Tower


Steel 80m Telecom Shelter Self Supporting Tower
Steel 80m Telecom Shelter Self Supporting Tower

Delivery Period :
(1) Less than 100ton: Within 1 Months after receiving the advance payment. 
(2) 100ton ~ 300ton: Within 2 Months after receiving the advance payment. 
(3) 300ton ~ 600ton: Within 3 Months after receiving the advance payment. 
(4) 600ton ~ 1500ton: Within 4 Months after receiving the advance payment. 


Why Choose us? 
* Tower Design tailor made to your requirements 
* Pre Dispatch inspection by buyer or international inspection agency. 
* Steel certified as per international. 
* Design of Tower as per China/ International design standards. 
* Galvanization as per international standard. 
* Timely project completion. 
* Convenient transportation to Qingdao port & airport(only one hour)
* We are manufacturer. We have our own land & factory. The land was bought instead of rent.
* Independent import & export authorization from government.
* Price is competitive

 

Curve LED Display

Curve Display,Kurve LED-Display,Curved LED Display,Outdoor Curve LED Display

Fixed LED Display Co., Ltd. , http://www.chaledlights.com

Posted on